ENVIRONMENTAL POLICY

FESR Basilicata 2014-2020

Installation of a photovoltaic system with a peak power of 8 kW and storage system with capacity of 12 kWh.
New production line with high energy efficiency. By increasing the loading and unloading capacity of the system, benefits are obtained not only for production but also for the reduction of electricity consumption.